Maximum reliability and quality

Steel and welding constructions

   

Finishing and welding components up to a unit weight of 200 t is part of our qualified staff's day-to-day business.

A well-established working process that doesn't lapse into routine ensures maximum reliability and quality throughout the production process. Needless to say, this process is carried out in line with the customer's wishes and standard requirements.

What we’re capable of:

 

Some of the welding methods used:

  • MAG / metal active gas welding
  • MIG / metal inert gas welding
  • TIG / tungsten inert gas welding
  • SAW / submerged arc welding

With our submerged arc narrow-gap equipment, we are able to reliably weld very thick walls.
Even thicker than 500 mm. We’ve already successfully accomplished this in some of our projects.

Stress relief annealing (annealing at 580-600°C) is carried out in our own annealing furnace with the corresponding approval.

We either perform non-destructive tests internally or commission external experts. Three of our own highly qualified welding engineers (IWE) and two welding technicians are responsible for organizing and supervising these activities.

And what can we do for you?

Contact now

Sample references forSteel and welding constructions

Stahlbau
Stahlbau
Stahlbau
Stahlbau
Stahlbau
Stahlbau
Stahlbau
Stahlbau
Stahlbau
Stahlbau
Stahlbau
Stahlbau
Stahlbau
Stahlbau
Stahlbau
Up to 200t
individual unit weight
8000m²
production area
Up to 36m
of machining
Since 1969
top quality
Sie müssen Marketing-Cookies akzeptieren um Google Maps anzusehen.
© 2024 DILEB Maschinenbau GmbH & Co. KG | Dillinger Str. 130 | 66822 Lebach / Saar
Imprint  â€¢  Data protection  â€¢  Disclaimer